Manufacturing Process

From 3D render to 500,000 units.

Four phases, each with a written milestone. A dedicated sales engineer follows your order end-to-end, so you always know which step it is in.

Phase 01 / 04

Send Your Brief

Tell us the shape, volume, colour, decoration and target quantity. The more detail, the tighter the quote.

Dedicated sales engineer assigned to your project
Written quotation within 24 hours
NDA available for new-product secrecy
Send Your Brief at the Sineasy factory
Phase 02 / 04

Design & Sampling

Your bottle takes shape before any steel is cut. 3D render first, then a physical sample you can hold.

3D render in 3 days
New mould + physical sample in 15–25 days
Sample couriered to your door
Design & Sampling at the Sineasy factory
Phase 03 / 04

Approval & Production

Production starts only after you sign off the sample. Every stage is inspected and photographed.

100% in-line inspection
Photo reports at every QC stage
Standard shapes: 25–35 days
Approval & Production at the Sineasy factory
Phase 04 / 04

Delivery Worldwide

Export-standard packing protects the finish from Guangzhou to your market, by sea or by air.

FOB Guangzhou or door-to-door
Sea and air freight arranged
Typical lead time 25–35 days after sample approval
Delivery Worldwide at the Sineasy factory
Lead Times

What the clock says

PhaseDurationDetail
3D Render 3 days Concept visualisation before any mould is opened — free at quotation stage.
New Mould + Sample 15–25 days Mould cutting, first articles, sample dispatch to your door.
Standard Production 25–35 days After sample approval, for existing or catalogue shapes.
New Mould Production 40–50 days Full mass production for fully custom shapes, MOQ 5,000.
Shipping FOB / Door-to-door Sea or air freight from Guangzhou to your market.

Start step
one today.

Reply within 24 hours Send Your Brief